Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cover Kitchen Remodeling: The Palo Alto Owner’s Guide
Cover kitchen remodeling in Palo Alto typically runs $14,000-$45,000 installed, depending on whether you’re refreshing cabinets and countertops or gutting the space to the studs. We stock Cover-compatible cabinet lines, hardware, and fixture packages, and most Palo Alto homeowners get a written quote the same day we measure. Most owners realize their Cover kitchen needs attention when drawer glides start sticking, cabinet faces delaminate from Peninsula fog cycles, or the original particleboard boxes sag after a decade of moisture exposure.
Which Cover Models This Applies To
Cover manufactured kitchen cabinetry and storage systems from the late 1990s through roughly 2018 under several series names. The most common in Palo Alto are the Cover Classic line (raised-panel doors, 3/4-inch plywood boxes, pre-2010), Cover Contemporary (slab or Shaker-style, 2010-2016), and the short-lived Cover Premier series with soft-close hardware and full-extension dovetail drawers. To identify yours, check the hinge cup bore pattern (35mm for Classic and Contemporary, 26mm for Premier), or look for a stamped date code inside the door frame near the handle bore.
The Classic series used a proprietary 5/8-inch shelf pin spacing that doesn’t match standard 32mm European hardware. We’ve seen Palo Alto homeowners buy standard Blum or Salice hinges and discover the mounting plates land in the wrong spot. For Premier series, the soft-close drawer boxes were built to Cover’s spec and won’t accept standard 21-inch side-mount slides without shimming. We source OEM-grade replacements where they still exist, or fabricate matched plywood boxes when they don’t. KraftMaid and Wellborn offer dimensionally compatible lines if you’re replacing the whole cabinet run rather than patching in.
Signs Your Cover Kitchen Remodeling Is Failing

- Doors won’t stay closed or hang crooked. The original Cover hinge mounting plates were zinc-coated steel that fatigues around year 12 in Palo Alto’s dry summers. The screw holes wallow out, and the door drops. We replace with Blum Clip-Tops on hardwood dowels, not the original press-in plates.
- Drawer fronts separate from the box. Cover used MDF drawer fronts with a vinyl wrap and hot-melt edge banding. Heat from dishwashers or west-facing windows softens the adhesive. The fix is a new hardwood front, not more glue.
- Shelves bow or crack. Classic series 1/2-inch particleboard shelves load-rated to 30 pounds sag under Palo Alto’s heavy Le Creuset collections. We upgrade to 3/4-inch maple-veneer plywood with metal shelf standards.
- Water stains at the sink cabinet floor. Cover’s sink bases used a particleboard floor with a thin melamine skin. One leak and the material swells like a sponge. We replace with a marine-grade plywood base and a proper drip tray.
- Finish peels at door edges. The UV-cured topcoat on Cover’s darker stains (espresso, cherry) degrades faster on south-facing Palo Alto kitchens. We see this most in Old Palo Alto and Professorville homes with original galley layouts and limited overhang.
Before
AfterReplacement Cost & What’s Included
| Scope | Price Range in Palo Alto |
|---|---|
| Full kitchen remodel (Cover removal + new) | $14,000 - $45,000 |
| Small kitchen refresh (12 cabinets or fewer) | $9,000 - $20,000 |
| Cabinet installation only (new boxes, existing layout) | $4,000 - $13,000 |
| Countertop replacement (Cambria or Silestone) | $2,000 - $6,500 |
| Backsplash installation | $800 - $2,500 |
| Kitchen island addition or rebuild | $3,000 - $10,000 |
What drives the range: box material (particleboard vs. plywood), door style complexity, and whether we’re moving plumbing or electrical. Every Rowan quote lists line-item material costs, labor hours, and a separate permit line if we’re altering gas or electrical. Under Clause 1 of the Haven Standard, that written price is locked until you sign a change order. We’ve finished 4,000-plus projects within a few percent of the original number. The 365-Day Done Right Promise covers installation and hardware function; material warranties run through the manufacturer (KraftMaid lifetime limited, Cambria lifetime residential).
DIY or Call Us?

There’s safe checking, and then there’s the part where most homeowners in Palo Alto call us.
Safe to DIY: Confirm your series with the hinge bore measurement. Tighten loose screws with a manual driver, not a drill that strips particleboard. Test drawer slide function with the box empty. These steps tell you whether you’re looking at hardware fatigue or box failure.
Where DIY goes wrong: Removing a run of upper cabinets solo risks wall damage and personal injury, especially in post-war Palo Alto homes with questionable drywall anchors. Cutting countertops to fit new cooktop specs requires dust containment and a diamond blade most homeowners don’t own. And any electrical or gas appliance relocation needs a permit pulled through Palo Alto’s Planning and Community Environment department, with inspection scheduled.
We bring background-checked, uniformed crews, a documented photo record of every visit, and we pull permits as standard. Measure twice, write it down, then we talk. Call (650) 446-9092 to schedule your free estimate.
FAQs
Cover cabinets installed before 2010 usually show functional decline at 12-18 years in Palo Alto’s climate, faster if the kitchen faces south or west. The particleboard boxes don’t tolerate our dry heat cycles well, and the hinge hardware fatigues predictably. Call (650) 446-9092 and we’ll assess what’s salvageable versus what needs replacement.
Partial repair makes sense if the boxes are plywood (rare in Classic series) and only hardware or doors have failed. Particleboard boxes with water damage or shelf sag are not cost-effectively repairable; the material doesn’t return to spec. We offer a free second opinion on any written estimate if you’re comparing repair versus replace.
Typical turnaround from demolition to final punch is 3-5 weeks for a standard Palo Alto kitchen, assuming no structural or permit delays. We stock standard cabinet sizes from KraftMaid and Wellborn; custom or matched detailing adds 2-3 weeks. Every phase is photo-documented, and we don’t start demolition until all materials are on-site.
We carry Blum hinge hardware, shelf standards, and drawer slide sets that fit most Cover configurations. Full cabinet boxes and doors are warehouse-stocked in San Jose, not truck-carried, but we measure and order within 48 hours of signed approval. Call (650) 446-9092 to schedule a truck stock check against your specific model.
Written by Grant Rowan, Owner, Rowan Construction Group Palo Alto at Rowan Construction Group Palo Alto, serving Palo Alto and nearby areas.







Before
After
Before
After
Before
After