A Rowan company - serving Palo Alto, CA

Cabinet Installation & Refacing in Palo Alto, CA

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Cabinet Installation & Refacing in Palo Alto, CA

Cabinet installation and refacing in Palo Alto typically runs between $3,800 and $22,000 depending on scope, material choice, and whether you’re replacing boxes or refreshing existing ones. Most Palo Alto kitchens we work on fall somewhere in the $6,000 to $14,000 range – large enough to feel like a real project, specific enough to price accurately before anyone picks up a drill. At Rowan Construction Group Palo Alto, every cabinet job starts with a written flat price and a written scope, both delivered before work begins. That’s not a process preference; it’s Clause 1 of the Haven Standard, and it’s been the rule on every one of our 4,000-plus projects since 2007.

If you’re already thinking through a broader kitchen renovation, our Kitchen Remodeling in Palo Alto page walks through the full scope of what that looks like – cabinet work sits at the center of nearly every kitchen remodel we do in this market. For questions right now, call us at (650) 446-9092.

Grant Rowan has led this company since it was founded, and the cabinet work we deliver reflects the same documentation discipline that runs through every other trade we operate: photo record on every visit, signed change order before any scope change, and a 365-Day Done Right Promise in writing – not in the handshake.

Palo Alto kitchens present a specific set of conditions. Many homes in Squares like Crescent Park, Old Palo Alto, and the University South neighborhoods were built between the 1940s and 1970s, with original frameless cabinet boxes that were never designed for the drawer-within-drawer hardware that today’s homeowners expect. Others in newer construction near the California Avenue corridor have 20-year-old builder-grade face-frame cabinets where the doors have delaminated but the plywood boxes underneath are structurally sound – a textbook candidate for refacing rather than full replacement. Knowing which situation you’re in before pricing begins is exactly what the written scope is for.

When You Need Cabinet Installation & Refacing

  • Doors that have delaminated or swollen at the edges. This is common in Palo Alto homes near Barron Park and Midtown, where older kitchens have flat-panel doors that were glued rather than solid-wood routed. When the surface separates, refacing with new door profiles and a veneer wrap on the visible box faces solves the problem without replacing structural boxes that are still square and solid.
  • A layout that no longer works but boxes that are still plumb and solid. If your existing cabinets were installed correctly and the plywood hasn’t warped or delaminated, adding new doors, drawer fronts, and hardware through a refacing project can deliver 80 percent of the visual result for 40 to 60 percent of the cost of full replacement.
  • A full kitchen gut where the existing cabinets are beyond salvage. Builder-grade cabinets from the late 1990s and early 2000s – particleboard boxes with stapled joints – tend to fail at the corners when they’ve been through one or two dishwasher leaks. When the box structure is compromised, full replacement with KraftMaid or Wellborn cabinetry is the right call, not a patch.
  • A new kitchen addition or ADU where cabinets need to be specified from scratch. We source from more than 50 vetted brands, which means the written quote reflects actual distributor pricing rather than inflated retail figures. For addition and ADU projects, cabinet specification happens during the design phase so the number in the contract is honest from the start.
  • Storage that was never designed for how the kitchen actually gets used. Many Palo Alto homes have upper cabinets that reach the ceiling with no pull-down hardware, or base cabinets with a single fixed shelf inside a 36-inch-wide opening. New installation with drawer stack inserts, pull-out shelves, and Lazy Susan corner solutions changes the utility of the space without touching the countertop or appliances.
  • Pre-sale preparation where ROI matters. In a market where Palo Alto median prices hold above $3 million, updated cabinetry photographs well and supports the listing. Refacing is often the faster, less disruptive path to a kitchen that reads as current without a full remodel timeline before close.

Our Cabinet Installation & Refacing Process

professional contractor applying mortar for kitchen backsplash tile installation
Our Cabinet Installation & Refacing Process
  1. Written Scope and Flat Price Before Anything Starts

    We measure the kitchen, assess the condition of the existing box structure, note any out-of-plumb walls or unlevel floors (both common in older Palo Alto ranches), and deliver a written flat price with a line-itemized scope. You’ll see the cabinet line – brand, door style, finish, hardware allowance – and the labor line separately, so you know what you’re agreeing to. Under the Haven Standard, that price doesn’t change unless you change the scope, and no scope change proceeds without a signed change order.

  2. Material Selection and Lead-Time Confirmation

    KraftMaid semi-custom cabinets typically run a 2-to-4-week lead from order to delivery. Wellborn full-custom can extend to 6 to 8 weeks. We confirm lead times in writing before the contract is signed, which matters in Palo Alto where homeowners are often coordinating around school schedules or rental staging timelines. For refacing projects, door and drawer-front lead times vary by species – paint-grade maple is almost always faster than rift-cut white oak, which has had supply constraints in the Bay Area market for the past two years.

  3. Site Preparation and Existing Cabinet Assessment

    For refacing, our crew removes all doors, drawer fronts, and hardware and documents the condition of every box face with photographs – this is the photo record that leaves with you at the end of the project, not something we hold internally. For full replacement, demolition is staged to protect countertops and appliances that aren’t being replaced. If we find a substrate condition that wasn’t visible during the estimate – a compromised toe kick, a water-damaged lower nailer – that finding is documented and presented to you before any additional work proceeds.

  4. Installation or Refacing Execution

    Cabinet installation in a standard Palo Alto kitchen – roughly 180 to 240 linear inches of upper and lower cabinets – runs 2 to 4 days for experienced crews working clean. Wall cabinets are hung to a level line scribed across the wall; base cabinets are shimmed to level and then scribed to the floor. In older Palo Alto homes, walls are rarely perfectly plumb and floors are rarely perfectly flat, and we account for that in the scribe work rather than hiding it behind filler strips. Refacing typically runs 1 to 3 days for the same linear footage, depending on the number of doors and the complexity of the face-frame veneer wrap.

  5. Hardware, Adjustments, and Punchlist

    Soft-close hinges are calibrated after doors are hung so they close flush without bounce. Drawer slides are adjusted for gap consistency. Every door and drawer front is checked against the others for alignment before the crew leaves. The punchlist is walked with you – not left on a clipboard – so you can note anything that doesn’t meet your expectation while the crew is still on site to address it.

  6. Documented Closeout and 365-Day Promise

    The photo record from the final walkthrough is delivered to you. The written warranty is the 365-Day Done Right Promise: if anything related to our installation isn’t right within a year, we make it right – that’s printed in the contract, not referenced in a footnote. Grant Rowan’s name is on the company, and that’s the standard he holds the work to.

BeforeBefore
AfterAfter

Cabinet Installation & Refacing Pricing in Palo Alto

Cabinet work is one of the most price-variable trades in kitchen remodeling, so the ranges below are built from real Palo Alto project data, not national averages. The Palo Alto market runs higher than regional medians for a few honest reasons: labor costs in Santa Clara County, the prevalence of older homes with non-standard wall configurations, and the expectation that installations are done cleanly enough for a home at this price point.

Scope Typical Palo Alto Range What Drives the Number
Cabinet Refacing (doors, drawer fronts, veneer wrap) $3,800 – $9,500 Number of doors and drawers, wood species, paint vs. stain finish, hardware selection
Semi-Custom Cabinet Installation (KraftMaid) $7,500 – $14,000 Linear footage, box configuration, interior accessories (pull-outs, drawer stacks), finish level
Full-Custom Cabinet Installation (Wellborn or equivalent) $13,000 – $22,000+ Custom sizing for non-standard ceiling heights, inset door construction, full-extension hardware, furniture-grade finish
Hardware Upgrade Only (hinges, pulls, handles) $600 – $2,200 Number of pieces, brand selection, whether soft-close conversion requires new hinge cups
Interior Accessory Package (pull-outs, Lazy Susans, drawer inserts) $900 – $3,500 Number of cabinets being retrofitted, brand of hardware, whether new drawer boxes are needed

What Moves the Price in Palo Alto Specifically

Ceiling height is a real factor here. A significant number of Old Palo Alto and Crescent Park homes have 9-foot or 10-foot ceilings in the kitchen, which means standard 30-inch upper cabinets leave a substantial gap that either gets filled with a decorative soffit or requires custom-height boxes. Custom-height boxes cost more; a decorative soffit is a separate carpentry line item. Both options get spelled out in the written scope so you’re choosing, not being surprised.

Paint-grade finishes cost less than stain-grade finishes at the door level, but they add a painter’s visit if you want them to match an existing trim color exactly. Semi-custom lines like KraftMaid offer factory-painted options in a wide color range that typically match better and hold up longer than field-painted doors – that’s a specification decision we walk through during the estimate, not after.

Appliance garage cutouts, open shelving sections, and glass-front door inserts all add to the base price. They’re not surprises if the scope describes them before the quote is signed.

Free Second Opinion on Any Written Estimate

If you have a competitor’s written estimate for cabinet work in Palo Alto, bring it to us. Grant Rowan reviews it line by line at no charge and tells you where the numbers are reasonable and where they aren’t. This isn’t a sales tactic – it’s a standing offer because our pricing is built to hold up to scrutiny. Call (650) 446-9092 to schedule that conversation.

FAQs – Cabinet Installation & Refacing in Palo Alto

Worker installing a stone countertop during a kitchen remodeling project
FAQs – Cabinet Installation & Refacing in Palo Alto

Is cabinet refacing worth it, or should I just replace the cabinets?

Refacing is worth it when two conditions are true: the existing box frames are structurally solid (no delamination, no warping, joints are still tight) and the layout of the kitchen already works for how you use the space. When those conditions are met, refacing delivers a near-full visual transformation at 40 to 60 percent of full replacement cost. When the boxes are failing or the layout is wrong, refacing is money spent on a problem it can’t solve – and we’ll tell you that during the estimate, not after. Call (650) 446-9092 for a written scope that answers the question for your specific kitchen.

How long does cabinet installation take in a typical Palo Alto kitchen?

Full cabinet installation in a standard Palo Alto kitchen – typically 180 to 240 linear inches of combined upper and lower cabinets – runs 2 to 4 installation days once materials are on site. Add the lead time for semi-custom (2 to 4 weeks) or full-custom (6 to 8 weeks) cabinets, and you have a realistic project window. Refacing the same kitchen runs 1 to 3 days because the boxes stay in place. Both timelines are written into the contract so you can plan around them. For questions about scheduling, call (650) 446-9092.

Do I need a permit for cabinet installation or refacing in Palo Alto?

The City of Palo Alto Building Department does not require a permit for cosmetic cabinet work – new doors, refacing, hardware replacement – where no structural changes are made and no electrical, plumbing, or gas lines are relocated. Full cabinet replacement that involves moving a range hood duct, relocating an electrical outlet, or adjusting plumbing supply lines for an island sink will trigger permit requirements. We identify those conditions during the scope review and handle permitting as part of the written project scope when it’s required. Never pull a permit yourself on a job a contractor is doing – it shifts liability in ways that aren’t in your favor.

What cabinet brands does Rowan Construction Group use in Palo Alto projects?

For semi-custom work, KraftMaid is our primary line – it’s built to a consistent specification, available in a broad range of door styles and finishes, and the lead times are predictable, which matters for project scheduling. For full-custom applications – non-standard ceiling heights, inset construction, furniture-grade finishes – we source through Wellborn. Both are in our written quotes at honest distributor-based pricing, not inflated retail figures. The brand and product line appear on the written scope by name, so you know exactly what’s being installed before anyone starts. Call (650) 446-9092 or visit our home page to learn more about how we source materials across all seven trades.


Get the price in writing before anything starts.A real person answers, day or night.
Call now

Key Takeaways

  • Cabinet refacing in Palo Alto typically costs $3,800 to $9,500; full installation runs $7,500 to $22,000 depending on brand and configuration.
  • Refacing makes sense when the existing box structure is sound and the layout works; full replacement is the right answer when boxes are failing or the layout needs to change.
  • Every Rowan project starts with a written flat price and written scope – no work begins, and no scope changes proceed, without a signed document.
  • The 365-Day Done Right Promise is in writing on every contract, not referenced in a footnote.
  • Grant Rowan offers a free second opinion on any written estimate from a competitor – call (650) 446-9092 to schedule it.
  • Permit requirements in Palo Alto depend on whether trades beyond carpentry are being touched; we identify those conditions during the estimate.

Ready to see a written price for your cabinet project? Call Rowan Construction Group Palo Alto at (650) 446-9092. Grant Rowan and the team will walk the kitchen with you, assess the existing cabinet condition, and deliver a flat written price with a line-itemized scope – before anyone picks up a tool. If you’re still early in your thinking about a broader Kitchen Remodeling in Palo Alto project, that conversation starts the same way: with a number on paper, not a promise in the air.

Written by Grant Rowan, Owner at Rowan Construction Group Palo Alto, serving Palo Alto since 2007.

Need Construction help in Palo Alto? Licensed & insured · Free written quotes response · free estimates
Call (650) 446-9092
Local Service Coverage

Request a Free Estimate in Palo Alto

Tell us what you need - Rowan Construction Group Palo Alto responds fast. No obligation.

By clicking submit, you agree to the terms of our Privacy Policy and agree that you may be contacted by phone, text, or email concerning your request, including by the partner businesses that may perform the service.

Prefer to text? Text Now
Call Now - Fast Dispatch